KAVORTE / Reactor specifications

Reactor specifications

What we build, and what is recorded before the vessel leaves the workshop.

Technical range

Standard range

ItemRange or standard
Capacity50 to 30,000 litres
ShellCarbon steel, glass lining fired to the shell
Lining thicknessSpecified in mm per order, measured and recorded per unit
HeatingJacket, inner coil, immersion tube or half-pipe
AgitatorSix types: paddle, anchor, disc turbine, hydrofoil, impeller, dispersion disc
SealMechanical seal or gland packing, matched to pressure
Pressure testHydrostatic test, witnessed and recorded
Lining integrity20 kV spark test over the whole lining
DocumentsMaterial certificates, test records, dimensional report, packing photos and video
Operating temperature-19 to 180 °C

Pressure and temperature limits are set per order against the medium and the jacket duty. We do not publish one figure that would be wrong for half the applications.

Not every duty suits glass

Glass lining is the wrong answer for hydrofluoric acid, fluoride-bearing media, hot concentrated alkali, and duties where nothing but a polished surface will do. In those cases we quote stainless, PTFE lining or Hastelloy instead.

Tell us the medium and the volume, and we will confirm whether glass lining fits before we quote.

Request a quote

Message Alex on WhatsApp